THIS PAGE IS DISPLAYING 10 PICTURES AND TEXT
THERE ARE 4 PAGES TO THIS SECTION
• PLEASE SCROLL DOWN • PAGE 1 •

HOME l PAGE 2 l PAGE 3 l PAGE 4 l » NEXT »

OUR PICKUP WITH MORE LUMBER.

SIDE PREP FOR MONITOR BARN

40 STICKS FILLS THE LITTLE F-150.

SIDE PREP FOR MONITOR BARN

THE FIRST HORIZONTAL
ON THE REAR GABLE END.

SIDE PREP FOR MONITOR BARN

HAND NAILED WITH POLE NAILS.

SIDE PREP FOR MONITOR BARN

DOING LEFT SIDE ON LADDER
I'M RIGHT HANDED

SIDE PREP FOR MONITOR BARN

THIS WAS THE FIRST BENT WE PUT UP
AND HAD ADDED 2 X 6 FILLER
IN THE WRONG PLACE. SO NOW
CUTTING IT OUT WITH THE MILWAUKEE.

SIDE PREP FOR MONITOR BARN

RENAILING THE PIECE THAT STAYS
PRE DRILL TO AVOID SPLITTING.

SIDE PREP FOR MONITOR BARN

MAKING THE SECOND CUT
AGAIN HARDER TO WORK TO THE LEFT.

SIDE PREP FOR MONITOR BARN

NOTCHING ONE OF THE VERTICAL STUDS.

SIDE PREP FOR MONITOR BARN

ANOTHER VIEW OF THE NOTCHED STUD.

SIDE PREP FOR MONITOR BARN

HOME l PAGE 2 l PAGE 3 l PAGE 4 l » NEXT »

Valid HTML 4.0 Transitional CoffeeCup - HTML Editor- Flash - Web Design Software
All content of this page is the sole property of NINETYNINE.COM
And protectected under the standard copyright laws. 2011@NINETYNINE