THIS PAGE IS DISPLAYING 10 PICTURES AND TEXT
THERE ARE 3 PAGES TO THIS SECTION
• PLEASE SCROLL DOWN • PAGE 1 •

HOME l PAGE 2 l PAGE 3 l » NEXT »

WE ARE GOING TO NEED A WAY TO LIFT THE BEAMS
AND POSTS ETC. HERE IS MY DESIGN TO BE ABLE
TO BUILD THE BARN FROM THE TOP DOWN WITHOUT
HAVING TO HIRE ANY HELP.

THIS IS OUR FIRST LOAD OF MATERIAL FOR THE PROJECT.

STAGING AND HOIST (DERRICK)

TOW HUBS THAT I MADE TO FLAT TOW OUR DRAG STOCKERS
BACK IN THE DAY. KNEW I SAVED THESE FOR SOMETHING.

STAGING AND HOIST (DERRICK)

DRILLING THE FORD, DODGE BOLT PATTERN.

STAGING AND HOIST (DERRICK)

BOLTING ON THE HUB

STAGING AND HOIST (DERRICK)

TIRES AND WHEELS ARE SPACESAVERS FROM
A LOCAL JUNKYARD, MOUNTED BACKWARDS.

STAGING AND HOIST (DERRICK)

4 X 4 PT POSTS.

STAGING AND HOIST (DERRICK)

LAYOUT FOR ONE SIDE
WILL BE APX. 22 FEET HIGH.

STAGING AND HOIST (DERRICK)

DRILLING FOR 2 INCH PIPE GOING IN TOP.

STAGING AND HOIST (DERRICK)

HOLE SAW WORKED GOOD.

STAGING AND HOIST (DERRICK)

PARTS LAID OUT ON PAD.

STAGING AND HOIST (DERRICK)

HOME l PAGE 2 l PAGE 3 l » NEXT »

Valid HTML 4.0 Transitional CoffeeCup - HTML Editor- Flash - Web Design Software
All content of this page is the sole property of NINETYNINE.COM
And protectected under the standard copyright laws. 2011@NINETYNINE