AS STATED IN THE PREVIOUS SECTION, WE HAD TO HIRE
THIS PART OF THE BUILD OUT BECAUSE OF THE SIZE OF
THE EQUIPMENT NEEDED. THIS IS GERALD STARK AND HIS
REALLY BIG 10 WHEELER. THIS IS THE FIRST LOAD OF 13
THAT IT WILL TAKE TO BUILD THE PAD AND DRIVEWAY.

BUILDING THE SB2 PAD

THIS LOAD GOING TO THE BACK OF THE PAD.

BUILDING THE SB2 PAD

JACK FINCH

BUILDING THE SB2 PAD

JACK DUG US A DITCH SO THAT I COULD INSTALL 4 INCH
SCH 40 DRAIN PIPES DOWN TO THE CULVERT.

BUILDING THE SB2 PAD

JACK AND ME IN THE DITCH. THE ONE ON THE RIGHT
GOES TO THE NORTH SIDE OF THE BARN, THE LEFT GOES
TO THE BACK OF THE HOUSE. THE PREVIOUS OWNER OF
THE HOME HAD NO WAY OF DRAINING THE BACK.

BUILDING THE SB2 PAD

I SET THIS PIPE AT THE FRONT CORNER OF THE BARN
IT WILL BE UNDERGROUND UNTIL WE NEED IT.

BUILDING THE SB2 PAD

JACK BACK FILLING THE DITCHES
THE STAKE IS THE FRONT CORNER OF THE BARN.

BUILDING THE SB2 PAD

FROM HERE UP I WILL USE STANDARD PIPE.

BUILDING THE SB2 PAD

THE STAKE IN THIS PICTURE IS THE BACKUP
THEY ALWAYS KNOCK DOWN THE GOOD ONE.

BUILDING THE SB2 PAD

JACK IS A REAL GOOD OPERATOR.

BUILDING THE SB2 PAD

HOME l PAGE 2 l PAGE 3 l » NEXT »

Valid HTML 4.0 Transitional CoffeeCup - HTML Editor- Flash - Web Design Software
All content of this page is the sole property of NINETYNINE.COM
And protectected under the standard copyright laws. 2011@NINETYNINE