THIS PAGE IS DISPLAYING 11 PICTURES AND TEXT
THERE ARE 5 PAGES TO THIS SECTION
• PLEASE SCROLL DOWN • PAGE 1 •
HOME l PAGE 2 l PAGE 3 l PAGE 4 l PAGE 5 l » NEXT »
WE HAD A PRETTY HARD WINTER OF 09-10
AND SPRING DIDN'T WORK OUT MUCH BETTER
HERE ARE COUPLE PICS OF THE WINTER AND OTHER
THINGS THAT NEEDED TO BE DONE BEFORE WE
GOT BACK AT IT IN EARNEST.

LOT OF SNOW AND ICE
ON THAT BOTTOM TARP

LOT OF SNOW FOR ARKANSAS

IT IS WET AND HEAVY AND STICKS
ARE KEEPING IT FROM SLIDING OFF

THIS IS WHERE WE LEFT OFF IN 09

ADDING 1 X 4 HORIZONTAL AND VERTICAL

WISH THE RAIN WOULD CEASE

DECIDED THAT WE NEEDED A BETTER LADDER

THIS IS A WERNER 22' MULTI LADDER

ADDING A SET OF LEVELOKS TO THE SAME SIDE RAILS
NOTE: THE THREE HOLES THAT I DRILLED

THE BASE UNITS BOLT DIRECTLY TO THE RAILS

HOME l PAGE 2 l PAGE 3 l PAGE 4 l PAGE 5 l » NEXT »

All content of this page is the sole property of NINETYNINE.COM
And protectected under the standard copyright laws. 2011@NINETYNINE