WATER CURED CEMENT, READY TO REMOVE FORMS.

PART OF THE DEAL, I WOULD REMOVE THE FORMS
FRONT HAD TO BE DUG OUT TO CLEAR THE REBAR

REBAR TO TIE INTO THE DRIVEWAY WHEN DONE.

FORMS GONE AND SEALER APPLIED TO SIDES

THIS WAS A LOT OF WORK IN THE HEAT

YOU CAN SEE IN THIS PICTURE THAT SOME OF THE
ANCHOR BOLTS ARE TOO LONG.

WE ARE USING SIMPSON ABE66 POST ANCHOR PADS
HAD TO CUT DOWN AND RETHREAD SOME TO MATCH
THE HEIGHT OF THE PADS.

BACKFILLING BY HAND

SHOULD HAVE LEFT MORE IN THIS PILE UP
NEXT TO THE PAD. ONLY HAD ABOUT HALF
WHAT IT TOOK AND HAD TO PUSH IT BACK UP.

FILLED AND RAKED

FINISHED PAD FROM NORTH SIDE.

FROM THE SOUTH SIDE.

THIS IS ALL OF THE SB2 THAT WAS LEFT.