THIS PAGE IS DISPLAYING 16 PICTURES AND TEXT
THERE ARE 2 PAGES TO THIS SECTION
• PLEASE SCROLL DOWN • PAGE 2 •

« PREVIOUS « l HOME l PAGE 1

THIS WORK IS BEING DONE IN APRIL OF 2008
WATCH THE PINE POLLEN AS THE TREES COME DOWN.

MONITOR BARN BUILDING SITE

NOT A GOOD PLACE TO HAVE AN ALERGY PROBLEM.

MONITOR BARN BUILDING SITE

THAT WAS A LOT OF POLLEN.

MONITOR BARN BUILDING SITE

LIMBING

MONITOR BARN BUILDING SITE

LOADING THE LARGE PIECES

MONITOR BARN BUILDING SITE

THEY LOADED ALL THE STUFF INTO THEIR 10 WHEELER.

MONITOR BARN BUILDING SITE

I KEPT THE PIECE OVER TO THE RIGHT.

MONITOR BARN BUILDING SITE

REMOVING THE SECOND STUMP.

MONITOR BARN BUILDING SITE

FILLING IT BACK IN

MONITOR BARN BUILDING SITE

PUTTING SOME PRESSURE ON IT.

MONITOR BARN BUILDING SITE

PULLING OUT THE BIG STUMP AND ALL THE ROOTS.

MONITOR BARN BUILDING SITE

THIS WAS A STUBBORN STUMP

MONITOR BARN BUILDING SITE

IT'S OUT.

MONITOR BARN BUILDING SITE

TREE NUMBER THREE

MONITOR BARN BUILDING SITE

THIS TREE WAS NOT REALLY IN THE WAY OF THE BARN
BUT THEY WERE HERE AND IT REALLY NEEDED TO GO.

MONITOR BARN BUILDING SITE

CHAIN ATTACHED AND READ TO PULL UP TO THE TRUCK.

MONITOR BARN BUILDING SITE

« PREVIOUS « l HOME l PAGE 1

• • CONTINUE THE STORY • •

Valid HTML 4.0 Transitional CoffeeCup - HTML Editor- Flash - Web Design Software
All content of this page is the sole property of NINETYNINE.COM
And protectected under the standard copyright laws. 2011@NINETYNINE