THIS PAGE IS DISPLAYING 10 PICTURES AND TEXT
THERE ARE 4 PAGES TO THIS SECTION
• PLEASE SCROLL DOWN • PAGE 1 •
HOME l PAGE 2 l PAGE 3 l PAGE 4 l » NEXT »
PRESSURE WASHING THE FRAMING

CHECKING THE WALL FOR FLAT

FIRST EIGHT INTERIOR BOARDS

THERE ARE TWO BOLTS UP THERE

NEEDED TO REMOVE THE NUTS BEFORE CLOSING IN

INSTALLING NEW FRAMING

NEW FRAMING ON LEFT SIDE

ADDING FRAMING TO MATCH

FRONT GETTING CLOSED IN

CUTTING NOTCHES FOR STIFFENER SHELVES

HOME l PAGE 2 l PAGE 3 l PAGE 4 l » NEXT »

All content of this page is the sole property of NINETYNINE.COM
And protectected under the standard copyright laws. 2011@NINETYNINE